Soluciones de Impacto Positivo
Success stories
Through our more than 16 years of experience, we have successfully delivered solutions and services that contribute to the improvement of our clients' processes.
01
Substation Modernization North Regional Transmission Management.
Client: CFE GRTE NORTH.
Objective: Replacement of 12 control and measurement protection boards of the Gómez Palacio Electrical Substation in 230 KV of the North Regional Transmission Management.
02
Total modernization of 6 plants of the Mexico Valley water basin organization, Cutzamala system, with a comprehensive substation protection and automation system.
Objective: Total replacement of 55 protection, control and measurement boards, engineering consoles, operation and SCADA systems for plant operation:
Floor 1: Villa de Colorines, Valle de Bravo, Edo. From Mexico.
Plant 2: Tilostoc, Valle de Bravo, Edo. From Mexico.
Plant 3: Tilostoc, Donato Guerra, Edo. From Mexico.
Floor 4: Tilos-toc, Donato Guerra, Edo. From Mexico.
Plant 5: Los Berros, Villa de Allende, Edo. From Mexico.
Floor 6: Villa de Allende, Edo. From Mexico.
03
Protection and control system for a static reactive power compensator for the Nuevo Vallarta Substation as part of the “306 SE 1803 Occidental Substation” project
Client: NR ELECTRIC USA, LLC.
Objective: Supply of protection, control and measurement boards and SCADA system to protect and control a 150 MVAR inductive reactive power static compensator that is supplied in the Nuevo Vallarta Substation.
04
Expansion of hydrometallurgy plants in Buenavista del Cobre, Grupo México.
Client: Buenavista del Cobre, Grupo México.
Objective: Supply of HMI systems, servers, consoles, video system and infrastructure for monitoring all hydrometallurgy plants. Solutions system in copper benefit plant, Buenavista del Cobre, Grupo México.