top of page

Success stories

Through our more than 16 years of experience, we have successfully delivered solutions and services that contribute to the improvement of our clients' processes.

IMG-20200721-WA0016.jpg

01

Substation Modernization North Regional Transmission Management. 

Client: CFE GRTE NORTH.
Objective: Replacement of 12 control and measurement protection boards of the Gómez Palacio Electrical Substation in 230 KV of the North Regional Transmission Management. 

02

Total modernization of 6 plants of the Mexico Valley water basin organization, Cutzamala system, with a comprehensive substation protection and automation system.

Objective: Total replacement of 55 protection, control and measurement boards, engineering consoles, operation and SCADA systems for plant operation:
Floor 1: Villa de Colorines, Valle de Bravo, Edo. From Mexico.

Plant 2: Tilostoc, Valle de Bravo, Edo. From Mexico.

Plant 3: Tilostoc, Donato Guerra, Edo. From Mexico.

Floor 4: Tilos-toc, Donato Guerra, Edo. From Mexico.

Plant 5: Los Berros, Villa de Allende, Edo. From Mexico.

Floor 6: Villa de Allende, Edo. From Mexico.

CUTZAMALA.png

03

IMG-20200721-WA0021.jpg

Protection and control system for a static reactive power compensator for the Nuevo Vallarta Substation as part of the “306 SE 1803 Occidental Substation” project

Client: NR ELECTRIC USA, LLC.

Objective: Supply of protection, control and measurement boards and SCADA system to protect and control a 150 MVAR inductive reactive power static compensator that is supplied in the Nuevo Vallarta Substation.

04

Expansion of hydrometallurgy plants in Buenavista del Cobre, Grupo México.

Client: Buenavista del Cobre, Grupo México.

Objective: Supply of HMI systems, servers, consoles, video system and infrastructure for monitoring all hydrometallurgy plants. Solutions system in copper benefit plant, Buenavista del Cobre, Grupo México. 

Interior-de-una-mina-M (1).jpg
LOGO HORIZONTAL-01.png
bottom of page